Installation of motor of Kunshan Dongxiong electromechanical Co., Ltd
1. The motor belongs to the vertical installation method, the flange end cover stop is matched with the furnace top stop, and there is a heat-resistant gasket in the middle (provided by the user).
2. Install the impeller in the taper part of the long shaft motor bearing, fix it with double round nut, and fasten the middle gasket.
3. The water-cooled end cover can prevent the heat in the furnace from transferring to the inside of the motor. The circulating water in the end cover shall not exceed 40 ℃. When the water temperature exceeds 40 ℃, the water flow shall be increased.
0512-57177411 / 13862656051
Address: www.5zz4.com
E-mail: 513212869@qq.com
Address: no.668, Tongcheng South Road, Baicheng Town, Kunshan City